
Answers grounded in confirmed pressure-vessel and storage-tank facts.
The assistant prioritizes the core business, flagship projects, confirmed seven-stage manufacturing flow, five minimum quotation inputs and disclosure controls. Final design, material, price, committed delivery and project-specific testing remain human-review items.
Current company facts sit above FAQ, AI retrieval and document evidence.
MPCA AZ4 is kept separate as Arizona while Samsung Texas Taylor T-PJT remains Texas, and 200㎥ is treated as a published project-capacity record rather than a fabrication maximum. Unresolved facts such as the 14-versus-17 headcount discrepancy are not presented as confirmed totals.
Canonical facts first
Pressure vessels/storage tanks, priority industries, actual process, project geography and the five RFQ inputs are the highest-authority facts.
Human confirmation
Final manufacturability, material selection, price, code/authorization applicability, committed delivery and NDE/pressure-test/FAT scope require project-specific human review.
No confidential project data
Do not enter customer drawings, customer-format quality documents, cost, contract or trade-secret material. Use the NDA-controlled Secure Project Data route instead.
Do not enter confidential drawings, cost data or trade secrets. Final price, delivery, design and code applicability require human review.