Five core inputs are enough to start an initial fabrication and quotation review.
The company-confirmed minimum inputs are tank material, design pressure/design temperature, nozzle/manhole requirements, wetted/non-wetted surface treatment, and other accessories. Final drawings are not required for initial intake.
Five core quotation inputs
Undecided items may be marked TBD. Send the information currently known across these five inputs first.
- 01Tank material
- 02Design pressure · design temperature
- 03Nozzle · Manhole requirements
- 04Surface treatment · wetted / non-wetted
- 05Other accessories
Drawings and supporting documents
Non-confidential documents may be used during initial inquiry. Customer drawings and customer-format quality documents move to an NDA-controlled secure channel.
- Non-confidential GA, P&ID, piping or reference drawings
- Non-confidential photos of existing or replacement equipment
- Additional lining, jacket or internal requirements
- Site access and installation constraints
Confidential-document handling
Customer drawings, customer-format quality documents, cost information and trade secrets should not be entered in general inquiry or AI chat. Share them only after agreeing an NDA-controlled transfer route.
View Secure Project Data