Semiconductor & Display
Chemical vessels and equipment frames, fabricated to your drawings and process conditions.
Start with the duty in your process.
Review covers vessels, nozzles, supporting structures and equipment frames for storage and distribution duties. Complete CCSS/PCW system design, controls and site work are agreed separately against the purchase specification.
- 01
High-purity and corrosion requirements
- 02
Drawing, nozzle and piping-interface review
- 03
Inspection records and traceable documentation
Equipment for this industry
Semiconductor & Chemical Vessels
Project-specific process vessels and storage tanks, including E.P tanks, lining tanks and related structures for semiconductor and chemical processes.
Product detailsE.P, Lining & PCW Tanks
Round and rectangular configurations for E.P, chemical, lining, PCW and waste-liquid tank applications.
Product details
Semiconductor Equipment & Frames
Equipment structures including HP unit, sliding and chamber frames, strip tanks, bodies and frames, and Omega-S frames.
Product detailsFabrication experience in public records
Project names may identify an end-use site. Refer to each project record for the contracting party and actual supply scope.
SK hynix M15X PH3 PJT
25 m³ and other sizes · 49 units
- Capacity / size
- 25 m³ and additional sizes
- Quantity
- 49 units
Documented project record
Project detailsSamsung Texas Taylor T-PJT
Multiple sizes · 50 units
- Capacity / size
- Multiple sizes
- Quantity
- 50 units
Documented project record
Project detailsWhat we review before quotation
We can start from an initial specification, then define drawings, inspection and document requirements during review.
Information to prepare
- Process media, concentration and purity requirements
- Capacity, configuration, design pressure and temperature
- Nozzle, piping and equipment interfaces
- Surface finish, cleaning, inspection and documentation
Fabrication considerations
- Material and lining review for purity and corrosion resistance
- Drainability, cleanability and dead-leg minimization
- Site piping, frame and installation-clearance review
- Traceable material, welding and inspection records
Review deliverables
- Manufacturability and supply-scope review
- Open technical points and clarification list
- Preliminary inspection and quality-document scope
- Additional data required for quotation and schedule review
Start with your drawings and operating conditions.
Your industry is carried into the enquiry form.