Factory Utilities & Piping
Compressed-air and water piping with coordinated tank installation and project scopes
PROCESS REQUIREMENTS
Factory Utilities & Piping
Compressed-air and water piping with coordinated tank installation and project scopes
Site routing and installation path
Aluminium and stainless material selection
Shutdown minimization and schedule coordination
ENGINEERING REVIEW INPUTS
- Utility type, flow, pressure and temperature
- Site drawings, routing and tie-in points
- Material, valve, support and insulation requirements
- Work zones, shutdown window and safety conditions
FABRICATION FOCUS
- Routing, interference and support-structure review
- Tank, piping and existing-equipment tie-in planning
- Work sequencing to minimize operational interruption
- Pressure test, flushing and commissioning scope
REVIEW OUTPUTS
- Manufacturability and supply-scope review
- Open technical points and clarification list
- Preliminary inspection and quality-document scope
- Additional data required for quotation and schedule review