
Start technical and quotation review with a drawing—or simply the core requirements you already know.
Engineering, EPC and procurement teams can send the material, capacity, pressure/temperature, nozzle and manhole requirements, surface finish, inspection conditions and target delivery date. S&D will define the fabrication scope and identify any open items.
We confirm requirements, define the fabrication scope, complete the technical review and then proceed to quotation discussion.
Early-stage projects without final drawings can also be reviewed. Items not yet defined are tracked as open items during the RFQ process.
RFQ Intake
We receive drawings, specifications or the core conditions already defined.
Open-Item Clarification
Only undefined items required for quotation and manufacturability review are clarified.
Engineering Review
Fabrication scope, welding/post-process, inspection, quality documentation and delivery conditions are reviewed.
Quotation & Supplier Response
Quotation, required submittals and next discussion items are provided against the reviewed scope.